US 12 (WIS 26-Whitewater) Corridor - Public involvement

Public meetings | Newsletters/others | Advisory committee | Environmental justice

Note - WisDOT has stopped all work on the study of a future US 12 Bypass through the town of Koshkonong south of Fort Atkinson. The final disposition of the study will be determined at a future date by the Transportation Projects Commission. (May 3, 2012)

Highway projects are developed as a cooperative effort among the public, state and federal review agencies, and WisDOT.

Preparing a project like the US 12 expansion from concept to actual construction takes many years. Extensive effort is always made to keep the public involved and informed throughout all stages of development.

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Public information meetings (PIM), hearings and other meetings

Scheduled/future

  • TBD - A public hearing will be held prior to recording the official map

Past meetings

Newsletters/others

Special interest groups

Advisory committee (AC)

Public participation is at the forefront of the EIS process as solutions are explored. WisDOT formed the AC to review the progress of the EIS and continue to provide local perspective. The committee has conducted 12 meetings to date.

AC consists of:

  • Three city of Fort Atkinson representatives
  • Three town of Koshkonong representatives
  • One Rock County representative
  • Two Jefferson County representatives
  • Two town of Lima representatives
  • Two town of Milton representatives

Since the public hearing on the Draft EIS, WisDOT has held a number of meetings with agencies and local officials, property owners, businesses, and farmers to study the potential indirect and cumulative effects a bypass would have on the built and natural environment. A focus group meeting on this topic was also held with local experts and stakeholders.

Environmental justice (EJ)

WisDOT is committed to equity and fairness and wants to ensure no one is excluded from the US 12 project decision making process.

Identifying and addressing a disproportionately high number of adverse effects on minority, low-income, disabled or elderly individuals will help achieve EJ and promote nondiscrimination in the community.

If you know of anyone who may be impacted by this project and/or whose voice is not being heard, contact:

back Back to Environmental documents

top Return to top


A presentation at a US 12 public hearing.

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey