US 51 (Reardon Rd.-County V (Grinde Rd.)) - Traffic impacts
Phase 1, Reardon Rd. to north of Vinburn Rd.
Stage 1 – Fall 2012-Summer 2013

WisDOT 511 logo.

Traffic/access | Road closures | Construction activities | Details | Camera images | Work zone safety tips

Traffic/access

  • Traffic flow will be on existing US 51
  • Reardon Rd. will have access to existing US 51

Road closures

  • Close and create cul-de-sac for Gray Rd. east of US 51
  • Windsor Rd. will be detoured during the end of stage 1 (after June 7, 2013) and continuing into the beginning of stage 2, no later than Sept. 27, 2013
    • Windsor Rd. detour – June 10, 2013-Sept. 27, 2013
      • Windsor Rd. (west) traffic traveling east – County CV/Lake Rd. to Vinburn Rd. to Portage Rd. and back to Windsor Rd.
      • Windsor Rd. (east) traffic traveling west – Portage Rd. to Vinburn Rd. to County CV/Lake Rd. and back to Windsor Rd.
      • Map key - Thick orange line is the project overview/location, yellow line is detour route, and the blue tear drop with dot in center are the project limits.
      • View US 51 (Reardon Rd.-County V (Grinde Rd.)) project in a larger map.

Construction activities

  • Northbound and southbound traffic switch/crossovers
  • Four new bridges:
    • Northbound US 51 over Bear Tree Prkwy.
    • Northbound US 51 over Windsor Rd.
    • Northbound US 51 over Vinburn Rd.
    • Southbound US 51 over Vinburn Rd.
  • Northbound US 51 between WIS 19 and Vinburn Rd.
  • Southbound US 51 from Gray Rd. to Vinburn Rd.
  • North Towne Rd. from Windsor Rd. to Gray Rd.
  • Northbound US 51 entrance and exit ramps at Windsor Rd.

  • Gray Rd. (east) cul-de-sac
  • Begin construction of Windsor Rd. including the three roundabouts
  • Begin construction of Bear Tree Prkwy. and Pederson Crossing Blvd.

Details

Stage 1 broken up into stage 1A and stage 1B

The following document are in Adobe PDF PDF format.
(Note: The files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

  • Stage 1A map – Fall 2012
    • Fall 2012, there will be minimal work affecting traffic
    • Gray Rd. east will lose access to US 51 and a cul-de-sac will be constructed
    • Temp crossover / traffic switch construction just north of the US 51 and WIS 19 interchange will require lane shifts in that area
    • All existing roadways and intersections will be carrying traffic
  • Stage 1B map – Fall 2012-Summer 2013
    • Fall 2012-2013 traffic will be on existing US 51, utilizing the temporary crossovers/traffic switch just north of the US 51 and WIS 19 interchange
    • Reardon Rd. will have access to existing US 51
    • Minimal work will be done over winter, with no affect on traffic
  • Stage 1B map – Windsor Rd. closure
    • Windsor Rd. will be closed from June 10 to Sept. 27, 2013; after the end of the spring school semester
    • Traffic will be on existing US 51
    • School buses will be provided access through the project area beginning at the start of the fall semester, approximately Sept. 3, 2013
    • Windsor Rd. detour – June 10, 2013-Sept. 27, 2013
      • Windsor Rd. (west) traffic traveling east – County CV/Lake Rd. to Vinburn Rd. to Portage Rd. and back to Windsor Rd.
      • Windsor Rd. (east) traffic traveling west – Portage Rd. to Vinburn Rd. to County CV/Lake Rd. and back to Windsor Rd.

Camera images

View current photos from project area (view NE)

Note - Photo updates approximately every 5 minutes, thus this page is set to refresh itself (or you may try refreshing the browser) every 5 minutes so the most current image is available for viewing.

US 51/WIS 19 camera image.

Camera images from WisDOT camera located at US 51/WIS 19 (view NE).

All closures are dependent on favorable weather conditions. Please drive with caution through work zones.

Work zone safety tips

  • Buckle up for safety
  • Expect the unexpected
  • Stay alert
  • Watch for flagging operations
  • Merge as soon as possible
  • Don't speed. Remember, fines double in work zones
  • Don't tailgate
  • Keep a safe distance
  • Observe posted signs
  • Be patient

Top Return to top


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey