Traffic impacts

Traffic impacts - Phase 1, Stage 1

Traffic impacts - Phase 1, Stage 2

Traffic impacts - Phase 1, Stage 3

US 51 (Reardon Rd.-County V (Grinde Rd.)) - Traffic impacts
Phase 1, Reardon Rd. to north of Vinburn Rd.
Stage 2 – Summer-Fall 2013

Traffic/access | Road closures | Construction activities | Details | Camera images | Work zone safety tips

Traffic/access

  • Traffic switched to the new northbound US 51 lanes
  • Reardon Rd. will have access to US 51 via the temporary connection, then Pederson Crossing Blvd. and Windsor Rd. once the cul-de-sac is started
  • Gray Rd. west will have temporary access to US 51 to provide Windsor Rd. (west) alternative access. This access will be removed when Windsor Rd. opens to traffic

Road closures

  • Windsor Rd. detour beginning in the second half of stage 1 will continue into the beginning of stage 2
    • Windsor Rd. detour – June 10, 2013-Sept. 27, 2013
      • Windsor Rd. (west) traffic traveling east – County CV/Lake Rd. to Vinburn Rd. to Portage Rd. and back to Windsor Rd.
      • Windsor Rd. (east) traffic traveling west – Portage Rd. to Vinburn Rd. to County CV/Lake Rd. and back to Windsor Rd.
    • US 51 (Reardon Rd.-County V (Grinde Rd.)) overview/location map.Map key

Construction activities

  • Southbound US 51 between WIS 19 and Gray Rd.
  • Two new bridges:
    • Southbound US 51 over Bear Tree Prkwy.
    • Southbound US 51 over Windsor Rd.
  • Complete Windsor Rd. including the three roundabouts
  • Southbound US 51 entrance and exit ramps at Windsor Rd.
  • Complete Bear Tree Prkwy. and Pederson Crossing Blvd.
  • Reardon Rd. cul-de-sac at the end of stage 2

Details

Stage 2 is broken up into stage 2A and stage 2B

The following document are in Adobe PDF PDF format.
(Note: The files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

  • Stage 2A map – Summer-fall 2013
    • During summer and fall 2013, traffic will be counter directional on the newly constructed US 51 northbound lanes
    • Windsor Rd. will be closed from June 10 and Sept. 27, 2013; after the end of the spring school semester
    • School buses will be provided access through the project area beginning at the start of the fall semester, approximately Sept. 3, 2013
    • Windsor Rd. detour – June 10, 2013-Sept. 27, 2013
      • Windsor Rd. (west) traffic traveling east – County CV/Lake Rd. to Vinburn Rd. to Portage Rd. and back to Windsor Rd.
      • Windsor Rd. (east) traffic traveling west – Portage Rd. to Vinburn Rd. to County CV/Lake Rd. and back to Windsor Rd.
  • Stage 2B map – Fall 2013
    • Beginning fall 2013, all newly constructed roadways and ramps will be open to traffic
    • The Gray Rd. west temporary access to the new US 51 will be removed
    • Reardon Rd. access to US 51 will be removed and a cul-de-sac will be constructed
    • Reardon Rd. will now have access to US 51 via Pederson Crossing Blvd. and Windsor Rd.
    • Minimal work will be done over winter, with no affect on traffic

Camera images

View current photos from project area (view NE)

Note - Photo updates approximately every 5 minutes, thus this page is set to refresh itself (or you may try refreshing the browser) every 5 minutes so the most current image is available for viewing.

US 51/WIS 19 camera image.

Camera images from WisDOT camera located at US 51/WIS 19 (view NE).

All closures are dependent on favorable weather conditions. Please drive with caution through the work zone.

Work zone safety tips

  • Buckle up for safety
  • Expect the unexpected
  • Stay alert
  • Watch for flagging operations
  • Merge as soon as possible
  • Don't speed. Remember, fines double in work zones
  • Don't tailgate
  • Keep a safe distance
  • Observe posted signs
  • Be patient

Back Back to Schedule

Top Return to top

WisDOT 511 logo.

Rd. construction.

Related information

WisDOT roundabouts

RIDESHARE programs (carpooling/bike commuting)

Life of a highway project

'In This Together' program - Info. for businesses located in work zones

Travel Easy - Safety info. for traveling through work zones

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey