Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.
Plans, studies and projects - North Central Transportation Region

Adams, Florence, Forest, Green Lake, Iron, Langlade, Lincoln, Marathon, Marquette, Menominee, Oneida, Portage, Price, Shawano, Vilas, Waupaca, Waushara and Wood counties.
Regional construction overview
Some documents below are in Adobe PDF
format
(Note: Some files are large and may take longer to download
depending on individual connection speeds. Users may need to zoom in
to see details.)
- NC region weekly construction update - Construction info. for the upcoming week (updated weekly during construction season).
- 2013 NC region construction map and report - state
- 2013 NC region construction map and report - local
Projects (under or scheduled for construction)
- Business 51 (Post Rd.), County B-Minnesota Ave., Portage County
- I-39/Business 51 Interchange, Rothschild - Marathon County
- I-39/US 51 (Business 51–Foxglove Rd.) southbound, Rothschild and Rib Mountain - Marathon County
- US 10 (WIS 13 - I-39) Expansion, Marshfield to Steven Point - Portage and Wood counties
- US 51/County U/County K/Business 51
interchange, Wausau - Marathon County
- US 51,
Minocqua (Front St.-Old Hwy 70) - Oneida County
- WIS 23 (County A-Glen Rd.) reconstruction, Fond du Lac and Green Lake counties
- WIS 29 (Sunrise Dr.-Business 51 Interchange), Rib Mountain and Rothschild - Marathon County
- WIS 29 (WIS 107-County O), Marathon City to Wausau - Marathon County
Plans and studies (no construction activity)
- I-39 (WIS 54-US 10 west) Corridor Study, Portage County
- WIS 29 Corridor Preservation Studies
- Abbotsford-Wausau,
Marathon County
- Apr. 12,
2012 PIM files
- County E
- Handout
- Presentation
- Big Rib River to WIS 107
- Handout
- Presentation
- County E
- Oct. 27,
2011 PIM files
- Handout/comment sheet Note - Comments were due Dec. 1, 2011
- Big Rib River to WIS 107
- County E, Option A
- County E, Option B
- County E, Option C
- County E, Option D
- Section 1, east
- Section 1, west
- Section 2
- Section 3
- Section 4
- Apr. 12,
2012 PIM files
- Wittenberg-Brown County line, Shawano County
- Ringle-Wittenberg, Marathon County
- Abbotsford-Wausau,
Marathon County
For more info. on NC Region plans, studies, and projects, contact:
Kristin McHugh, WisDOT North Central Region Communications
Manager
(715) 421-8380
kristin.mchugh@dot.wi.gov
Wisconsin Department of Transportation
North Central Region
Wisconsin Rapids Office
1681 Second Ave. South
Wisconsin Rapids, WI 54495-4768
Phone: (715) 421-8301
Fax: (715) 423-0334
WI Telecommunications Relay System (TTY): 711
Email:
ncr.dtsd@dot.wi.gov
Questions about the content of this page, contact:
WisDOT North Central Region Office,
ncr.dtsd@dot.wi.gov
Last modified: April 16, 2013
All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.




