WIS 22 (Main St.), 10th St.-WIS 156 - Need/purpose

Why is this project needed?

  • The existing pavement on WIS 22 (Main Street) and the Pigeon River Bridge has reached the end of its service life.
  • The proposed project will reconstruct the roadway and replace the bridge.
  • To improve the safety and operations of the roadway WisDOT is planning to modify the intersection of WIS 22 and 12th Street and the intersection of WIS 22 and WIS 156/Green Tree Road.
  • Underground utilities and storm sewer also need to be replaced.

Purpose

  • Repair the existing deteriorated pavement, curb and gutter, sidewalks, and storm sewer.
  • Upgrade the intersection of Main St. and 12th St. to better accommodate turning trucks.
  • Upgrade the WIS 22/WIS156/Green Tree Rd. intersection to increase the intersectionís safety for the traveling public.

Proposed improvements

  • Replace the existing pavement on WIS 22 (Main St.) along with underground utilities and storm sewer.
  • Replace the existing WIS 22 bridge over the Pigeon River Bridge.
  • The WIS 22 intersections with WIS 156 and Green Tree Rd. currently have features that contribute to driver confusion and result in operational and safety concerns. Proposed improvements include:
    • Replacing the Pigeon River Bridge.
    • Replacing the existing pavement, curb and gutter, sidewalk, storm sewer, street lighting, and traffic signals.
    • Widening the roadway between the Pigeon River Bridge and 13th St. by approximately 0.5-1.5 feet on each side to accommodate both bike and parking lanes. Per the cityís decision, on-street parking will not be allowed on Pigeon River Bridge. The proposed roadway would consist of:
      • Two, 12 foot travel lanes
      • 5 foot to 6 foot bike lanes
      • 8 foot parking lanes (includes the 2 foot gutters)
      • 1.5-5 foot boulevards
      • 5 foot sidewalks
    • Widening the roadway between 13th St. and WIS 156 by 1 foot on each side to accommodate bike lanes. Per the cityís decision, on-street parking will not be allowed between 13th St. and WIS 156. The proposed section would consist of:
      • Two, 12 foot travel lanes
      • 5 foot bike lanes
      • 2 foot gutters
      • 5 foot to 9 foot boulevards
      • 5 foot sidewalks
      • Adding pedestrian bumpouts at intersections of Main St. and 11th St., Main
        St. and 12th St., and Main St. and 13th St.
  • Widening the Main St. and 12th St. intersection.
  • Realigning the intersection of 16th St. and WIS 22 to improve vision for motorists.
  • Extending new sidewalk along both sides of WIS 22 to Main St. and the WIS 156/Green Tree Rd. intersection.
  • Upgrading the intersection of WIS 22 and WIS 156/Green Tree Rd. Upgrades will include an all-way, stop controlled intersection and realignment of WIS 156 and Green Tree Rd. so the two side roads are directly across from each other.
  • Replacing the cityís water main and sanitary sewer systems.

SSI - Project contacts Questions about the content of this page:
WisDOT North Central Region Office, ncr.dtsd@dot.wi.gov
Last modified: January 10, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.