skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

WIS 29 (Sunrise Dr.-Business 51 Interchange)

Need/purpose

Schedule

Maps

FAQ

Environmental documents

Public involvement

Traffic impacts

Related info.

Contacts

WIS 29 (Sunrise Dr.-Business 51 Interchange)
Town of Rib Mountain and village of Rothschild, Marathon County

Location | Overview | Status/phase

 

Project location

WIS 29 (Sunrise Dr.-Business 51 Interchange), town of Rib Mountain and village of Rothschild, Marathon County.

WIS 29 (Sunrise Dr.-Business 51 Interchange) project overview/location map. Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project boundary.

View WIS 29 (Sunrise Dr.-Business 51 Interchange) project maps.

Project overview

  • The existing WIS 29 eastbound and westbound pavement is nearing the end of its useful life and needs to be replaced.
  • The bridge decks of the eastbound and westbound bridges over the Wisconsin River and Business 51 are deteriorating and in need of replacement.
  • The Sunrise Drive overpass bridge deck needs preventative maintenance to extend its service life. The bridge does not meet current vertical clearance requirements and needs to be raised.

WIS 29 serves multiple communities along with being a regional backbone highway and providing a primary east-west roadway in northern Wisconsin.

Status/phase

Planning began in 2010. Project design began in 2012 and will continue through 2013. Construction is currently scheduled for 2014.

Sign up for email updates

 

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey