skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 51/County U/County K/Business 51 Interchange

Need/purpose

Schedule

Maps

FAQ

Public involvement

Traffic impacts

Project photos

Contacts

US 51/County U/County K/Business 51 Interchange - Traffic impacts

Quick access

Alternative routes and construction staging

Basics

News release - Marathon County U (Merrill Avenue) overpass removal rescheduled for Monday, April 8.

View US 51/County U/County K/Business 51 Interchange weekly construction update

  • Two lanes of traffic in each direction will be maintained on US 51 during peak travel hours.
  • A four-night closure of US 51 to remove the County U bridge over US 51.
    • Traffic will be detoured via the existing interchange ramps.
    • The contractor is tentatively scheduling this for April 1 through April 4, 2013.
  • County U will be closed to traffic beginning April 1, 2013 for approximately six months.
    • During the closure, traffic will be detoured via Westwood Drive and Bridge Street.
  • Periodic 15 to 20 minute closures of US 51 for blasting operations and beam placement.
    • Blasting operations are tentatively scheduled to start in mid-May 2013.
  • Periodic, temporary closures of interchange ramps.
  • County K traffic will be detoured to through traffic for approximately six months in 2014.
    • Traffic will be detoured via County U and Overlook Drive.

All closures are dependent on favorable weather conditions. Please drive with caution through work zones.

Work zone safety tips

  • Buckle up for safety
  • Expect the unexpected
  • Stay alert
  • Watch for flagging operations
  • Merge as soon as possible
  • Don't speed. Remember, fines double in work zones
  • Don't tailgate
  • Keep a safe distance
  • Observe posted signs
  • Be patient

Sign up for project updates

WisDOT 511 logo.

Rd. construction.


Related information

RIDESHARE programs (carpooling/bike commuting)

WisDOT Roundabouts

Life of a highway project

'In This Together' program - Info. for businesses located in work zones

Travel Easy - Safety info. for traveling through work zones

Apply for permit to install temporary business sign(s) in right of way PDF

I-39/US 51 (Business 51 – Foxglove Rd.) southbound, Rothschild, Marathon County - Located south of the US 51/County U/County K/Business 51 Interchange project

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey