WIS 116 Wolf River Bridge (village of Winneconne) - Public involvement

Public information meetings (PIM), hearings and other meetings

The following document(s) are in Adobe PDF PDF format unless labeled otherwise.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Scheduled/future

  • Late summer 2012 - Environmental report completion anticipated
  • Fall 2012 - Public hearing anticipated

Past meetings

2012

  • May 24, 2012 - PIM
    • View all items from this meeting WinZip (or view individual items below with smaller file sizes to reduce download times.) (14.2 MB)
    • Handout/comment sheet (Note - comments were due June 8, 2012)
    • Technical Memorandum, Benefit-Cost Analysis - May 15, 2012
    • Technical Memorandum, Preferred Alternative - May 8, 2012
    • Technical Memorandum, Visual Impact Assessment - March 8, 2012
    • Exhibits/maps
      • Part 1 of 2
        • Alternatives Screening Process
        • Preliminary Alternatives Eliminated From Consideration at February 2011 Public Meeting (1, 4, 5)
        • Preliminary Alternatives Eliminated From Consideration at February 2011 Public Meeting (3 movable, 3 fixed, 6, 2 movable, 2 fixed)
        • Typical sections
        • Alternative 3 – Movable bridge photo enhancements
        • Alternative 3 – Movable bridge photo enhancements
        • Alternative 2 – Fixed bridge (Preferred Alternative)
          photo enhancement
        • Alternative 2 – Fixed bridge (key observation points)
      • Part 2 of 2
        • Alternative 2 – Fixed bridge as viewed from key observation point 1 (view southwest from northeast end of bridge)
        • Alternative 2 – Fixed bridge as viewed from key observation point 2 (view west from southwest end of bridge)
        • Alternative 2 – Fixed bridge as viewed from key observation point 3 (view east from west end of bridge)
        • Alternative 2 – Fixed bridge as viewed from key observation point 4 (view southeast from northwest end of bridge)
        • Alternative 6 – Bridge rehabilitation
        • Alternative 3 – Fixed bridge
        • Alternative 3 – Movable span
        • Alternative 2 – Movable span
        • Alternative 2 – Fixed bridge
        • Alternative 2 - Fixed bridge plan and profile
        • What’s next?

2011

2010

2009

  • Dec. 10, 2009 – PSC Meeting

News releases

Newsletters/others

Special interest groups

Project Stakeholder Committee (PSC)

PSC is a group of local project stakeholders who serve as representatives of the community and actively participate in a consensus building process.

PSC members provide local insight on various elements of the project to ensure the project addresses local transportation needs.

back Back to Schedule

Top Return to top


People viewing a plan.

Related information

Life of a highway project

'In This Together' program - Info. for businesses located in work zones

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey