WIS 32 (3rd St.-8th St.)
De Pere, Brown County

WIS 32 (3rd St.-8th St.) project location map.
Map key - Thick orange line is the project overview/location, thin purple and green lines are project segments, and the blue tear drop with dot in center are the project limits.
View NE, WIS 32 (3rd St.-8th St.) project maps.
City of De Pere logo.

Location | Overview | Status/phase 

Note - There is an additional reconstruction project for WIS 32 on 8th St. (north of the Main St. intersection to Ash St.). This project is currently in preliminary design phase. For more info. on this project contact the NE region office (920) 492 5623.

View March 21, 2013 PIM info. including Alternative info.

Comments/feedback on alternatives due Monday June 3, 2013. Submit comments/feedback online or email to:
Chris Culotta, WisDOT Planning Project Manager
(920) 492-7712
christopher.culotta@dot.wi.gov

View the latest Newsletter - Mar. 2013

Project location

WIS 32 (Main St.), 3rd St. to 8th St., in city of De Pere, in Brown County.

Note - There is an additional reconstruction project for WIS 32 on 8th St. (Oak St. to Ash St.). This project is currently in preliminary design phase. For more info. on this project, contact the NE region office (920) 492 5623.

Project overview

WIS 32 provides a critical connection east and west of the Fox River thru downtown De Pere.

WisDOT, in partnership with the city of De Pere, is leading this one mile long study to help determine need and scope of future construction projects. The pavement condition and the need to replace utilities along WIS 32 have been identified. The highway’s typical cross section and capacity will be evaluated.

The purpose of this multi-year study is to determine what this busy corridor will look like in the future, and how it will best serve the citizens of De Pere, Brown County and Northeast Wisconsin.

A joint effort between the city of De Pere and WisDOT, by developing a long range plan, part of which incorporates evaluating the City of De Pere 2010 comprehensive plan and the De Pere Downtown Master Plan.

The study is looking to address:

  • Typical cross sections to meet transportation needs now and in the future
  • Existing and proposed traffic patterns for Main Ave. and Reid St.
  • Intersection operations
  • Bicycle/pedestrian and transit options
  • Existing railroad bridge structure for possible expansion
  • Utility replacements

This planning study will also provide information needed to determine the improvement schedule.

Planning started 2011.

Status/phase

Planning study with no construction activity at this time.


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey