Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.
Plans, studies and projects - Northwest Transportation Region

Ashland, Barron, Bayfield, Buffalo, Burnett, Chippewa, Clark, Douglas, Dunn, Eau Claire, Jackson, Pepin, Pierce, Polk, Rusk, Sawyer, St. Croix, Taylor, Trempealeau and Washburn counties.
Regional construction overview
Some documents below are in Adobe PDF
format
(Note: Some files are large and may take longer to download
depending on individual connection speeds. Users may need to zoom in
to see details.)
- Northwest region weekly construction update - Construction info. for the upcoming week (updated weekly)
- 2013 NW region construction map and report - state
- 2013 NW region construction map and report - local
Projects (under or scheduled for construction)
- St. Croix Crossing-Wisconsin Approach Project,
Town of St. Joseph/Houlton, WI - St. Croix County
- St. Croix Crossing (MNDOT website), St. Croix County (Wisconsin) and Washington County (Minnesota)
- US 2 (Belknap St.), Banks Ave.-Hill Ave. - Douglas County
- US 2 Bong Bridge, Superior - Douglas County
- WIS 13 Red Cliff Project, Bayfield to Red Cliff - Bayfield County
-
County J Bridge over WIS 29, Lafayette - Chippewa County
- WIS 35 (Tower Ave.) Reconstruction (US 2-N. 3rd St.) - Douglas County
- WIS 35 Radio Road Interchange, River Falls - St. Croix County
- WIS 35 Retaining Walls, Maiden Rock-Stockholm - Pierce/Pepin Counties
- US 12/WIS 54, Black River Falls - Jackson County
- US 63 Improvements, Baldwin - St. Croix County
Plans and studies (no construction activity)
- I-94 Corridor Study (US 12-WIS 65) - St. Croix County
- US 8 Corridor Preservation Study (WIS 35-US 53) - Polk and Barron counties
- Tier I, US 8 Environmental Impact Statement (EIS) Study (WIS 35-US 53) - Polk and Barron counties
- Tier II (WIS 35-US
53) Study - Polk and Barron counties
- Turtle Lake/Almena (15th St. - Hay River), Polk and Barron Counties
- Poskin/Barron (Hay River - US 53), Barron County
- US 53 Corridor Preservation Study (Rice Lake-Superior)
- Northern Douglas County Area (Wasko Rd.-53rd Ave. East) - Douglas County
- Haugen Area (26th Ave.-30th Ave.) - Barron County
- Spooner/Trego Area (WIS 70-Lampson) - Washburn County
- Minong Area (Schnagl Rd.-Wascott/Gordon Town line) - Washburn and Douglas counties
- US 63 Study (I-94 - WIS 64) - FONSI and Environmental Assessment (EA) - St. Croix County
- US 63/WIS 64 -
Environmental Assessment (EA), Study - St. Croix County
- WIS 35 Polk
County Studies - Polk County
- Osceola Intersection Study (WIS 35/WIS 243/County M) - Polk County
- WIS 64 Freeway/Expressway Designation and Conversion Study (150th St.-WIS 65) - St. Croix County
For more info. on NW region plans, studies, and projects, contact:
Chris Ouellette, WisDOT Northwest Region Communications Manager
(715) 833-9814
chris.ouellette@dot.wi.gov
Wisconsin Department of Transportation
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire, WI 54701
Phone: (715) 836-2891 or toll-free at (800) 991-5285
Fax: (715) 836-2807
WI Telecommunications Relay System (TTY): 711
Email:
nwr.dtsd@dot.wi.gov
Questions about the content of this page, contact:
WisDOT Northwest Region Office-Eau Claire,
nwr.dtsd@dot.wi.gov
Last modified: May 8, 2013
All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.




