St. Croix Crossing-Wisconsin Approach Project - Fast facts
Town of St. Joseph/Houlton, WI - St. Croix County

Project logo - St. Croix Crossing
View NW, St. Croix Crossing - Wisconsin Approach Project - St. Croix County in a larger map.
Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project limit.
Wisconsin 511 travel information
[an error occurred while processing this directive]

This new four-lane roadway will connect the to-be-built St. Croix River Crossing structure with the current WIS 64 four-lane expressway.

Join us for a St. Croix Crossing update at the following open houses:

  • May 23, 5-7 p.m., Hudson High School Cafeteria, 1501 Vine St.; Hudson, Wis.
  • June 4, 6:30-8 p.m., Houlton Elementary School, 70 County Hwy. E. Houlton, Wis.

Overview

This three-mile project completes the WIS 64 majors project that was built in the early 2000's. The four lane expressway from New Richmond to Houlton will now tie-in to the new St. Croix Crossing structure over the St. Croix River that is expected to open in 2016. The project will include:

  • WIS 35 overpass, located near the main bridge
  • WIS 35/County E interchange
  • Pedestrian and bike path
  • Two roundabout located at the ramp terminals

Schedule

  • August 2013 – First real estate parcels acquired for WisDOT approach project construction
  • September 2013 – Bids received for the second St. Croix River Bridge contract
  • December 2013 – Bids received for the first WisDOT approach contract
  • April 2014 – Work begins on Wisconsin approach (WIS 64)

A look ahead

  • Additional relocation of endangered flowers (Dotted Blazing Star).
  • Real estate acquistion will continue.
  • Developing concepts and plans for the Wisconsin section of the bicycle/pedestrian loop trail.
  • Relocating endangered mussels, on the Wisconsin shore, out of the project area.

For more St. Croix Crossing project information visit http://www.dot.state.mn.us/stcroixcrossing/index.html.

Contact information

Chris Ouellette, WisDOT Northwest Region Communications Manager
(715) 833-9814
chris.ouellette@dot.wi.gov

David Solberg, WisDOT Northwest Region Project Supervisor
(715) 833-5366
david.solberg@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Northwest Region, Eau Claire Office
718 W. Clairemont Ave.
Eau Claire WI
Phone (715) 836-2891 or toll-free (800) 991-5285
Fax: (715) 392-7863
WI Telecommunications Relay System (TTY): 711
Email: nwr.dtsd@dot.wi.gov

Server side include - Project contacts Questions about the content of this page, contact:
WisDOT Northwest Region Office, nwr.dtsd@dot.wi.gov
Last modified: May 14, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.