Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

Osceola Intersection (WIS 35/WIS 243/County M) Study - Need/purpose

View of WIS 35/WIS 243 intersection in downtown Osceola.

Why is this project needed?

WIS 35 is the main thoroughfare in the village of Osceola. It is a principle arterial which has significant local and regional importance to the transportation system.

Currently, WIS 35 operates at a low level of service during peak travel times, causing delays and safety concerns.

Project benefits/anticipated outcomes

Re-aligning the intersection is part of both the short-term solution of adapting exiting roadways to meet the needs of traffic and long-term goal of providing improved mobility in and around the village.

The goal of the alternative methods of realigning the roadways is to increase the flow of traffic and create a safer environment for motorists and pedestrians.

SSI - Project contacts Questions about the content of this page, contact:
WisDOT Northwest Region Office, nwr.dtsd@dot.wi.gov
Last modified: August 7, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.