WIS 241 (S. 27th St.) - Fast facts
Milwaukee, Milwaukee County

Wisconsin 511 travel information
View SE, WIS 241 (S. 27th St.) in Milwaukee, Milwaukee County in a larger map.
Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project limit.

Project update (March 2014)

A business outreach meeting was held on March 3, 2014 to discuss temporary access issues and local business concerns. View the meeting minutes

Location

WIS 241 (S. 27th St.), West Howard Ave. to 500 feet north of Dakota St., in the city of Milwaukee, Milwaukee County.

Overview

The project will consist of removing the existing pavement and reconstructing with concrete pavement. Each 36-foot roadway will be widened by two feet to provide a bicycle accommodation. Bike lanes will not be marked, except from Oklahoma Avenue north to the Union Pacific Rail Road Bridge. New curb and gutter, driveway approaches and sidewalk will be constructed at most locations. Storm sewer inlets will be replaced.

Various improvements will include: decorative crosswalks at West Morgan Avenue, West Oklahoma Avenue, the Kinnickinnic River Parkway and West Howard Avenue. Landscaping, planting and traffic upgrades are also planned. The bridge over the Kinnickinnic River will be rehabilitated and the culvert under West Loomis Road intersection will be repaired. West Loomis Road will also be reconstructed from South 27th Street to a point approximately 450 feet west of South 27th Street with this project during the first stage.

Promote your business during construction

Come In We're Open sign

Is your business located within mile of the WisDOT construction zone for this project? If so, help your business not only survive, but thrive, during the construction project. Promote your business by uploading your business information to our business listing website.

Need/purpose

The need for repairs in this area has been under consideration for a few years. The existing pavement is deteriorating and there is a severe rutting, rippling and shoving at bus stop locations. Severe reflective cracking is present throughout the entire length of the project. The underlying concrete base is heaving at several locations. The bridge over the Kinnickinnic River is in need of rehabilitation, as well as the culvert under the West Loomis Road intersection.

Schedule

March thru late fall 2014

Traffic impacts/detours

There will be one lane of traffic in each direction during construction. There will be no on street parking along south 27th street during the construction period. The west side of the median will be done first, then traffic will switch over, and the east side will be done.

Status/phase

Construction

Contact information

Christine Hanna, P.E., WisDOT Project Manager
(262) 548-8809
christine.hanna@dot.wi.gov

Brian DeNeve, WisDOT Southeast Region Communications Specialist
(262) 548-8759
brian.deneve@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southeast Region
141 NW Barstow St.
P.O. Box 798
Waukesha, WI 53187-0798
Phone: (262) 548-5902
Fax: (262) 548-5662
TDD: 711
ser.dtsd@dot.wi.gov

SSI - Project contacts Questions about the content of this page:
WisDOT Southeast Region Office, ser.dtsd@dot.wi.gov
Last modified: Mar. 25, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.