Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 41 Stadium Freeway - Fast facts
Milwaukee, Milwaukee County

Wisconsin 511 travel information
View SE, US 41 Stadium Freeway in Milwaukee, Milwaukee County in a larger map.
Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project limit.

Location

US 41, State St. to I-94 (Brewers Stadium), in Milwaukee, Milwaukee County.

Overview

The project will include:

  • Shoulder and barrier wall repair
  • Concrete pavement base patching, milling and overlaying of asphaltic surfaces of travel lanes, drainage improvement and pavement marking
  • Bridge deck replacement of the Wisconsin Avenue bridge
  • Concrete overlay at the Wells Street bridge
  • Structure painting for the Bluemound bridge all located over US 41

Promote your business during construction

Come In We're Open sign

Is your business located within mile of the WisDOT construction zone for this project? If so, help your business not only survive, but thrive, during the construction project. Promote your business by uploading your business information to our business listing website.

Schedule

  • Feb.-Fall 2014

Traffic impacts/Detours

  • Numerous night closures of system ramps in the US 41 and I-94 interchange.
  • A long duration closure of the Wisconsin Avenue on-ramp to southbound US 41.
  • Numerous night closures for northbound and southbound US 41 traffic expected for the duration of the roadway improvements.
  • For up to date daily closure information view current travel information on 511WI (select County = Milwaukee and Highway = US 41)

Wisconsin Avenue bridge deck replacement (present until Fall 2014)

  • Bridge deck to be constructed in halves, while maintaining one eastbound lane and one westbound lane across the bridge at all times.
  • Demolition of the deck will require full closures of northbound and southbound US 41.
  • Detour to be provided for full closures.

Wells Street bridge deck overlay (after completion of Wisconsin Avenue bridge)

  • Bi-directional traffic (eastbound and westbound traffic in a single lane) will be maintained on the bridge during the entire overlay process.

Status

Construction

Contact information

Ken Kiepczynski, P.E., Project Manager
(414) 659-3055
kenneth.kiepczynski@dot.wi.gov

Brian DeNeve, WisDOT SE Region Communications
(262) 548-8759
brian.deneve@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southeast Region
141 NW Barstow St.
P.O. Box 798
Waukesha, WI 53187-0798
Phone: (262) 548-5902
Fax: (262) 548-5662
TDD: 711
ser.dtsd@dot.wi.gov

SSI - Project contacts Questions about the content of this page:
WisDOT Southeast Region Office, ser.dtsd@dot.wi.gov
Last modified: April 4, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.