I-94 (70th St.-25th St.) East-West Corridor - Schedule

For information on public information meetings (PIM), hearings and other public activities, visit Public involvement.

Current (this year)

  • Draft graphic of planned activities from 2012 through 2014 PDF
  • The first community workshop will be held in late summer 2012.
  • Environmental/engineering analysis began in 2012.
  • Public involvement and stakeholder engagement initiated in summer 2012.

Future (next year and beyond)

2013

  • Environmental/engineering analysis continues, including the development and presentation of multiple design concepts, and the preparation of a Draft Environmental Impact Statement (EIS)
  • Public involvement and stakeholder engagement continues, including the conduct of a public hearing to receive testimony and comments on the Draft EIS and range of alternatives

2014

  • Preferred alternative is identified, and study concludes with the preparation of a Final EIS
  • Federal officials accept or modify WisDOT’s recommendation via the preparation and signing of a Record of Decision
  • The TPC meets in November 2014 and makes a determination if the project should proceed into the design phase

Top Return to top


 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey