Verona Rd. (US 18/151) Project - Maps

View 2013 and 2014 construction events brochure and detailed advanced improvements for 2013 and 2014

Project overview/location

Verona Rd. (US 18/151), County PD - Nakoma Rd., and Beltline (US 12/18), Whitney Way - Seminole Highway.

Map key - Orange line is stage 1 project overview/location, Purple line is stage 2 project overview/location, Blue tear drop with dot in center is the project boundary.
View SW, Verona Rd. (US 18/151) Project in a larger map

The following documents are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Proposed improvements

Stage 1

Beltline (US 12/18)/Whitney Way - Seminole Highway
Verona Rd. (US 18/151)/Raymond Rd. - Nakoma Rd.

Stage 1 overview/location map

Military Ridge bicycle/pedestrian path
  • Aesthetics - Bicycles and pedestrians to travel over County PD (McKee Rd).
Animation of proposed improvements
  • Verona Rd. (US 18/151) and Beltline interchange
    Beltline and Verona Rd. (US 18/151) interchange after stage 1 completion in 2016. Notice three major movements through the interchange – left turns from the Beltline to Verona Rd./Midvale Blvd.; left turns from Verona Rd./Midvale Blvd. to the Beltline; and through movements on Verona Rd./Midvale Blvd.
  • Verona Rd. (US 18/151) and Summit Rd. intersection
    Jug-handle intersection to be constructed at Verona Rd. (US 18/151) and Summit Rd. from 2014 to 2016. This intersection allows right-ins and right-outs and reduces “conflict points” thus increasing safety at the intersection.
  • Roundabout under Verona Rd. (US 18/151) for access to frontage roads
    Verona Rd. (US 18/151) passing over the roundabout south of Verona Rd. (US 18/151) and Summit Rd. jug-handle intersection. This roundabout provides access beneath Verona Rd. (US 18/151) using the frontage roads without crossing highway traffic or waiting at traffic signals.

Stage 2

Verona Rd. (US 18/151)/County PD - Raymond Rd.

Stage 2 overview/location map

Williamsburg Way alternatives

Note - users may need to zoom in to see details.

  • Alternative 1 - Signalize existing intersection. Moderate congestion exceeded two years after construction and total congestion 12 years after construction.
  • Alternative 2 - Modified half diamond interchange. Moderate congestion exceeded 20 years after construction and total congestion 45 years after construction.

Stage 3

This stage is not scheduled to occur for 20-30 years.

Proposed noise barrier locations and information

Top Return to top

Sign up for project updates


Related information

RIDESHARE programs (carpooling/bike commuting)

'In This Together' program - Information for businesses located in work zones

Travel Easy - Safety info. for traveling through work zones

Life of a highway project

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey