skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 51 (Terminal Dr./Voges Rd.-WIS 19)

Alternatives

Alternative A

Alternative B

Alternative C

US 51 (Terminal Dr./Voges Rd.-WIS 19) - Alternative A

General overview

  • Adds capacity to intersections and improves mobility without additional traffic lanes or interchanges
  • Turn lanes are added or extended at most intersections
  • Signal coordination
  • Relocation of the Broadway intersection to the north
  • Re-design of the frontage road intersections at Pflaum Rd. and Buckeye Rd.
  • Connect Anderson St. to East Washington Ave. at the Lien Rd. intersection
  • Remove Daentl Rd. access

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Maps

US 51 corridor, Dane County central segment (Stoughton Road) - Alternative A

Back Back to Alternatives

back Back to Schedule

Sign up for email updates


Related information

US 51 (I-39/90 - US 12/18), Stoughton-McFarland, EIS study (project to the south)

US 51 (WIS 19-County V (Grinde Rd.)) - Construction beginning this year (project to the north)

'In This Together' program - Info. for businesses located in work zones

WisDOT roundabouts

Life of a highway project

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey