skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 51 (Terminal Dr./Voges Rd.-WIS 19)

Alternatives

Alternative A

Alternative B

Alternative C

US 51 (Terminal Dr./Voges Rd.-WIS 19) - Alternative C

General overview

  • Provides a free-flow movement for traffic through the corridor.
  • Includes interchanges at the locations listed in Alternative B (Pflaum Rd., Buckeye Rd., Lexington Ave./Commercial Ave., East Washington Ave. and Hoepker Rd.) and at Terminal Dr./Voges Rd., Kinsman Blvd., and Rieder Rd./Amelia Earhart Dr.
  • Includes express lanes over US 12/18 (Beltline) and express lanes over WIS 30/railroad crossing/Lexington Ave.

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Maps

US 51 corridor, Dane County central segment (Stoughton Road) - Alternative C

Back Back to Alternatives

back Back to Schedule

Sign up for email updates


Related information

US 51 (I-39/90 - US 12/18), Stoughton-McFarland, EIS study (project to the south)

US 51 (WIS 19-County V (Grinde Rd.)) - Construction beginning this year (project to the north)

'In This Together' program - Info. for businesses located in work zones

WisDOT roundabouts

Life of a highway project

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey