skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 51, McFarland-DeForest

Need/purpose

Schedule

Maps

Alternatives

FAQ

Environmental documents

Public involvement

Project reports

Improvements

Related info.

Contacts

Sign up for updates

US 51, McFarland-DeForest - Project reports

Prior to the current EIS study, a Needs Assessment (NA) and Traffic, Safety and Needs Identification Analysis (TSNIA) Study was completed for the corridor.

The following document(s) are in Adobe PDF PDF format unless specified otherwise.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Traffic, Safety and Needs Identification Analysis (TSNIA)

TSNIA corridor study conducted to develop long-term planning alternatives to address issues identified in the Needs Assessment. Completed in 2012.

Needs Assessment (NA)

NA conducted to identify corridor deficiencies and needs, completed in 2003.

To make arrangements to view the report or to obtain a printed copy or a copy on CD contact:

Jeff Berens, WisDOT Project Manager
(608) 245-2656
jeff.berens@dot.wi.gov

There will be a charge for hard copies and CDs. You will be notified of any charges prior to the material being sent.


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey