I-90 (La Crosse) Reconstruction

Need/purpose

Schedule

Maps

Environmental documents

Public involvement

Related info.

Contacts

Sign up for updates

I-90 (La Crosse) Reconstruction - Maps

Project location

I-90 reconstruction

  • I-90, Round Lake Bridge (Campbell ) to Theater Rd. (Onalaska), in La Crosse County.

I-90/US 53/WIS 35 interchange reconstruction

  • US 53 (Rose St) from Livingston St. to I-90/US 53/WIS 35 interchange
  • WIS 35 from Campbell St. (La Crosse) to Elm St. (Onalaska)

WIS 157 Bridge construction

  • WIS 157 eastbound and westbound bridges over I-90.

Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project limit.

View SW, I-90 (La Crosse) Reconstruction in a larger map.

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Project overview

Preferred alternatives

Construction staging

Detour routes

April 2013 - PAC meeting

Sept. 20, 2012 - PIM

View all maps from this mtg.

  • Maps
    • Project overview
    • WIS 157 construction staging - 2013
    • I-90/US 53/WIS 35 – Diamond interchange alternative
    • Construction by year - 2013
    • Construction by year - 2014
    • Construction by year - 2015
    • Construction by year - 2016
    • Oak Forest Drive at Rose Street
      • Preferred - Traffic signal alternative
      • Roundabout alternative
    • Rose Street bicycle/pedestrian connections
    • Detour plan – Southbound WIS 157 to eastbound I-90
    • Detour plan – Northbound WIS 157 to westbound I-90
    • Preliminary West George St. concepts, Alt. 1
    • Preliminary West George St. concepts, Alt. 2
    • Preliminary West George St. concepts, Alt. 3
    • Preliminary West George St. concepts, Alt. 4

April 12, 2012 - PIM

  • Existing I-90/US 53/WIS 35 (Exit 3) Interchange
  • Planned improvements - The project includes the following measures to repair, maintain, and in some cases improve the existing infrastructure:
    • Replace pavement on I-90, Round Lake to Theater Rd.
    • Replace bridge deck on County BW
    • Replace pavement between ramp terminals and make bridge improvements at County B interchange
    • Reconstruct US 53/W1S 35, Livingston St. (La Crosse) to Elm St. (Onalaska)
    • Reconfigure US 53/W1S 35 interchange (Exit 3)
    • Replace 1-90 structures over Great River State Trail with new box culvert
    • Add third lane (auxiliary lane) in each direction on I-90, between US 53/WIS 35 (Exit 3) and WIS 157 interchanges
    • Perform work on existing WIS 157 structures over 1-90

Top Return to top


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey