Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 14 Corridor Study - Reports

Note - Study completed July 2014

Corridor Management Plan

The Corridor Management Plan is comprised of the four chapters of the Existing Conditions Report with an additional chapter that offers conclusions and possible strategies. The improvement strategies are given to address the deficiencies and corridor needs that were identifies in the Existing Conditions Report.

Existing Conditions Report


The Existing Conditions Report is a compilation of the data gathered during the study and is composed of:

  • Study purpose
  • Transportation facilities
  • Local land use and transportation planning
  • Environmental resources
  • Public involvement
  • Traffic, crash and geometric analysis

To make arrangements to view the report or to obtain a printed copy or a copy on CD contact:

Mark Westerveld, WisDOT Project Manager
(608) 246-5355
Mark.Westerveld@dot.wi.gov

There will be a charge for hard copies and CDs. You will be notified of any charges prior to the material being sent.

Questions about the content of this page, contact:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: August 5, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.