US 10 (WIS 13 - I-39) Expansion - Traffic impacts

News release New four-lane US 10 segment opened Friday, July 13, in Wood County (July 12, 2012)

View Wisconsin 511 travel information for current traffic conditions

Wood County

US 10
Location: White Oak Road to Trestik Road
Schedule: April 17 to mid-October 2012
Cost: $17 million
Description: Crews will pave the new alignment of US 10 from White Oak Road to Trestik Road, which has been previously constructed.
Traffic impacts: During construction, existing US 10 will remain open to one lane in each direction. Motorists should be alert for slow moving construction vehicles crossing the highway.

US 10 (*updated*)
Location: Klondike Drive to Wood County BB
Schedule: July 5, 2011 to December 2012
Cost: $12.3 million
Description: Crews are constructing a four-lane divided highway between Marshfield and Stevens Point. This project involves the construction of roundabouts at the US 10 / Klondike Drive / WIS 13 intersection, the new US 10 / County BB intersection, and the Central Avenue / existing US 10 intersection. Crews will also construct and prepare the new alignment of US 10 for concrete paving.
Traffic impacts: Motorists can expect to encounter the following traffic impacts: US 10 is open to one lane in each direction with a 12-foot width restriction. Motorists can expect to encounter traffic shifts and crossovers.
WIS 13/80 at the south intersection with US 10 is closed. This location will remain closed until crews complete construction of the roundabout in October. During the closure, WIS 13/80 traffic will be detoured via WIS 13/73, WIS 186 and US 10.
Motorists traveling south on US 10/WIS 13 will be able to access US 10 west. However, they will not be able to travel south to WIS 13/80 and will have to follow the detour.
Motorists traveling north on WIS 13/80 will not be able to access US 10 west or US 10/WIS 13 and will need to follow the detour.
US 10 from Central Avenue to approximately one quarter mile east is closed. Access will be maintained for adjacent property owners except for brief periods of storm sewer, grading or concrete work.
The Washington Avenue overpass (town of Cameron) is closed. The overpass is expected to reopen by Tuesday, August 7.

Work zone safety tips

  • Buckle up for safety
  • Expect the unexpected
  • Stay alert
  • Watch for flagging operations
  • Merge as soon as possible
  • Don't speed. Remember, fines double in work zones
  • Don't tailgate
  • Keep a safe distance
  • Observe posted signs
  • Be patient

Top Return to top


WisDOT 511 logo.

Rd. construction.

Related information

WisDOT roundabouts

'In This Together' program - Info. for businesses located in work zones

Completed projects

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey