US 151 (Columbus-Waupun) Freeway Conversion - Environmental documents

  • 2013-2014 - Environmental study scheduled to be completed.
  • 2014-2016 - Prepare official map.

An Environmental Assessment (EA) will be produced during phase 2 of the study. The EA will evaluate the environmental impacts of a number of alternatives developed during the study.

The EA phase began in 2010 with anticipated completion in 2012.


Wetlands along US 151 south of Beaver Dam.

 

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey