WIS 26 corridor - Expansion project - Segment 2, WIS 59 relocation at Milton

Project overview

Segment 2 consists of relocating WIS 59 approximately 0.25 miles south of its present location to provide space for the construction of an interchange with the WIS 26 bypass around the east side of the city of Milton.

Improvements start at the current WIS 26 and St. Mary intersection and extend east back to existing WIS 59 just prior to the Vickerman Road intersection.

The new WIS 59 will have one lane in each direction with a median to provide room for turn lanes at intersections and the future WIS 26 interchange. Sufficient real estate will be purchased at this time for future expansion of WIS 59 to a four-lane facility. An existing segment of County M will be realigned starting at Town Line Road and extending north to the newly relocated WIS 59. County M will then run west with WIS 59.

A railroad spur crosses proposed WIS 59 and will require grade separation bridges. WIS 59 will go over the railroad.

Roundabouts will be constructed at the WIS 26 interchange ramp connections to WIS 59 at the new County M intersection.

The section of existing WIS 59 will be jurisdictionally transferred to local government when the new WIS 59 is opened to traffic.

Schedule

Real estate acquisition is scheduled to start in 2008.

Construction of relocated WIS 59 and County M is scheduled for 2009. The estimated construction cost is $5.5 million (in 2008 dollars).

Maps

Project overview/location

Map of WIS 26 corridor expansion segment 2.

The following documents are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Public information meetings (PIM)

Scheduled/future

  • There are no meetings scheduled at this time.

Past meetings

  • April 19, 2007 - PIM was held in Milton.

Newsletters/handouts/others

Back Back to WIS 26 expansion project

Top Return to top

WIS 26 expansion project segments:

Segment 1 - Janesville to Milton

Segment 2 - WIS 59 relocation at Milton

Segment 3 - Milton to Fort Atkinson

Segment 4 - Fort Atkinson bypass

Segment 5 - Jefferson bypass

Segment 6 - Jefferson to Johnson Creek

Segment 7 - Johnson Creek to Watertown

Segment 8 - Watertown to WIS 60 East

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey