WIS 26 corridor - Expansion project - Segment 4, Fort Atkinson bypass

Project overview

Segment 4 consists of adding two lanes and a median along the existing WIS 26 Fort Atkinson bypass for 5.5 miles from the south interchange to WIS 89. No access will be allowed except at the four existing interchanges. Bridges will be constructed at Hoard and Banker roads to provide through travel over WIS 26.

Schedule

Real estate acquisition is scheduled to start in 2008 and construction from fall 2010 through 2011.

The estimated construction cost is $20.4 million (in 2008 dollars).

Maps

Project overview/location

Map of WIS 26 corridor segment 4.

The following documents are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Public information meetings (PIM)

Scheduled/future

  • There are no scheduled meetings to report on at this time.

Past meetings

  • April 17, 2007 - PIM

Newsletters/handouts/others

Back Back to WIS 26 expansion project

Top Return to top

WIS 26 expansion project segments:

Segment 1 - Janesville to Milton

Segment 2 - WIS 59 relocation at Milton

Segment 3 - Milton to Fort Atkinson

Segment 4 - Fort Atkinson bypass

Segment 5 - Jefferson bypass

Segment 6 - Jefferson to Johnson Creek

Segment 7 - Johnson Creek to Watertown

Segment 8 - Watertown to WIS 60 East

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey