Need/purpose

Schedule

Maps

Environmental documents

Public involvement

Contacts

WIS 45/100 (W. Puetz Rd. - W. Layton Ave.) Corridor Study

Project location

WIS 45/100, W. Puetz Rd. - W. Layton Ave., within communities of Franklin, Hales Corners, and Greenfield, in Milwaukee County.

WIS 45/100 (W. Puetz Rd. - W. Layton Ave.) Corridor Study overview/location map.Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project boundary.
View SE, WIS 45/100 (W. Puetz Rd. - W. Layton Ave.) Corridor study maps.

Project overview

5.3-mile study to:

  • Evaluate need for additional lanes
  • Analyze traffic at all intersections
  • Evaluate access locations and median openings to improve highway safety and efficiency
  • Evaluate impacts of proposed improvement alternatives

Study outcomes to include:

  • Environmental Assessment (EA) document
  • Design Study report
  • Preliminary plan

This study to address long term safety and congestion needs that could not be addressed with the 2007 pavement resurfacing and maintenance project.

Study started in 2007.

Status/phase

Study with no construction activity at this time.

Top Return to top


 

 

 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey